Annual Volume 1996

 

Quality of Public Investment in Bangladesh:
An Annexure to Independent Review of Bangladesh's Development 1996

This volume on Quality of Public Investment in Bangladesh embodies the results of a set of in-depth surveys carried out by the Centre for Policy Dialogue (CPD) in order to examine the quality of design, implementation and monitoring of eight major public sector undertakings in Bangladesh. Whilst an executive summary of the major findings of this pioneering investigation has appeared as a separate chapter in Growth or Stagnation? A Review of Bangladesh's Development 1996 (IRBD 1996), the current annexure volume to IRBD 1996 details the findings of the investigation concerning each of the eight projects which were put under close scrutiny in the course of the review. The analysis presented in this volume is based on extensive field surveys. The review provides a wealth of information about the quality of project management in Bangladesh including project design, phasing of various components of these projects, quality of implementation, economic viability and sustainability of the projects. Whilst the review focuses on only a limited number of projects, the observations, conclusions and policy implications relate to the overall investment environment existing in the country and as such the review provides practical and useful insights into the efficacy of the overall development process in Bangladesh.

(back to IRBD main page)

Contents

Chapter 1
QUALITY OF PUBLIC INVESTMENT IN BANGLADESH: AN OVERVIEW

Chapter 2
CASE STUDY 1
BARAPUKURIA COAL MINE DEVELOPMENT PROJECT

Chapter 3
CASE STUDY 2
210 MW CHITTAGONG THERMAL POWER STATION

Chapter 4
CASE STUDY 3
SYSTEM Loss REDUCTION SCHEME

Chapter 5
CASE STUDY 4
EXPANDED PROGRAMME ON IMMUNIZATION

Chapter 6
CASE STUDY 5
UPAZILA RESOURCE DEVELOPMENT AND EMPLOYMENT PROJECT

Chapter 7
CASE STUDY 6
CONSTRUCTION OF JAMUNA MULTIPURPOSE BRIDGE

Chapter 8
CASE STUDY 7
CONSTRUCTION OF TWO MULTIPURPOSE BERTHS WITH BACK-UP FA AND PROCUREMENT OF CARGO HANDLING EQUIPMENT

Chapter 9
CASE STUDY 8
ESTABLISHMENT OF A MODERN WORKSHOP FOR HEAVY REPAIRS AND MAINTENANCE OF DIESEL LOCOMOTIVES